Ability to limit the future dating range
A feature that can limit the future date range in the "Available dates" of a date field that the signer can select?
For example, we don't want them signing today (Aug 2025) for a start date too far in the future (e.g. January 2026).
We might not be able to maintain/honor our current pricing that far in advance.
5
votes